Structural Engineering
Slater Family Ice Arena Renovation

Project Overview
Originally opened in 1967 and then named for the Slater Family in 2017, the Bowling Green State University’s (BGSU) Slater Family Ice Arena serves as the home for the Falcon Hockey team (NCAA Division I), multiple high school hockey teams, the Bowling Green Skating Club, and the Bowling Green Youth Hockey Association.
The renovation included a new mezzanine at the south side of the arena and main entrance lobby addition. The 6,400 SF mezzanine includes four private suites, additional premium fan seating, and concessions. The 1,220 SF entrance addition revised the ticketing and main entrance to the arena for more efficient patron flow including a large new opening to the arena floor. The project also included renovations to various restrooms throughout the building.
Year
2024
Size
9,906 SF
Role
sub-
consultant
ABOUT THP
THP Limited is a structural and architectural engineering design firm. With a mission to shape a more resilient and equitable future, we put people at the center of everything we do.
PRIMARY LOCATIONS
Cincinnati
221 East Fourth St., Ste 1150
Cincinnati, Ohio 45202
513.241.3222
Cleveland
812 Huron Road, Ste 850
Cleveland, Ohio 44115
216.553.4973
Raleigh
555 Fayetteville Street, Ste 300
Raleigh, North Carolina 27601
919.341.0225
SATELLITE LOCATIONS
Raleigh, North Carolina
Northern Virginia
